Project Helius
LINK ===== https://byltly.com/2tl0va
Regarding the proposed 100 MW project in Southampton, the company reported that the initial statutory consultation process is complete. The next steps include preparing and submitting an application for a Development Consent Order from the Infrastructure Planning Directorate.
The present book provides a critical annotated Latin text (with English translation on facing pages) of Eobanus's publications during these early years at Erfurt. It is the first volume of a projected multivolume series of all of his published works. A substantial apparatus of explanatory and biographical footnotes accompanies the text, and an extensive set of \"Supplementary Notes\" traces the sources and parallels (mainly classical, but occasionally patristic, biblical, and medieval) of the poems. The value of this volume is enhanced by several indexes: abbreviations, medieval and Neo-Latin words, a glossarial index to the Latin text, and a long general index covering names and subjects. The texts edited here were previously accessible only in rare and sometimes defective sixteenth-century editions. The footnotes include much useful biographical information on a significant population of (mostly young) German humanists who had considerable influence in their own lifetimes but are seldom included in modern reference works. These individuals flit through the pages of specialized articles and monographs on the early German Renaissance but have been difficult even for specialists to identify and trace. Inclusion of the footnotes in the general index means that this useful assemblage of biographical material will be accessible for future researchers. 59ce067264
https://en.balinida.com/group/mysite-231-group/discussion/27cd88d4-c7e3-49b3-9ae6-94ef27da78ce